MEP
MEP: why clash review before ceiling close saves time
Reopening ceilings is usually the result of missing earlier coordination.
Every ceiling reopen for pipe or electrical fixes doubles cost: materials, labour and finish schedule. H2Q puts clash review before hang and before close.
Shop drawings are not paperwork only — they are the technical agreement between disciplines before install.