Architecture & engineering design
Functional options, IFC documents, multi-discipline coordination.
Advisory → IFC
H2Q
H2Q takes scoped packages: technical documents, site works and schedule–budget coordination. Progress is reported against milestones, with numbers.
0+
Years of experience
0+
Completed projects
0k
m² delivered
0
Focus sectors
Engage one package, or combine design, build and project management.
01
Design documents aligned with construction and investment budget
Clarify function, life-cycle cost and discipline interfaces before construction starts.
02
Milestone-based construction — schedule and quality with numbers
Main contract or civil–industrial trade packages; site safety and weekly progress reporting.
03
One desk to coordinate scope, budget and risk
Coordinate design–trades–acceptance; control variations for the owner.
Typical scopes when working with enterprise owners.
Functional options, IFC documents, multi-discipline coordination.
Advisory → IFC
Main contract or trade packages; weekly progress reports.
Trade → main contract
Reinforced concrete, internal roads, drainage, on-plot utilities.
Technical packages
Electrical, plumbing, HVAC and finishes by zone.
Multi-system coordination
Master schedule, RACI, change control, trade coordination.
PM / PMC
As-built documents, warranties, operating guidance.
Handover package
Focused on enterprise and commercial buildings.
Summarised as problem — work done — measurable result.
Factories & logistics · 2025
Warehouse capacity expansion without interrupting operations.
Offices & headquarters · 2024
Light structural upgrade and fit-out for a working HQ.
Retail & showrooms · 2024
Facade and MEP aligned to a fixed opening date.
From enquiry to handover: clear scope, milestones and responsibility.
Clarify investment goals, site conditions and legal–technical constraints.
Technical option, programme and package-level budget frame.
Lock scope, RACI, quality plan and site safety plan.
Milestone reporting, variation control, site coordination.
Close-out documents, warranties and early operations support.
Certificate list will be updated when official documents are available.
Brief your need and preferred reply date.