Design
Buildable design: where cost is usually saved
Early MEP–structure interface review usually costs less than site rework.
Large cost often appears when drawings look fine but are hard to build. H2Q locks interfaces early so structure and MEP clash less before concrete pours or long-lead orders.
One timely clash review can save many days of repair. That is why design should connect to procurement and build sequence from the first option.