H2Q
Logistics factory — Binh Duong

Factories & logistics · 2025

Logistics factory — Binh Duong

Problem

The owner needed more floor area while the live line kept running.

Work done

H2Q phased works by shift, tightened boundary HSE and coordinated MEP in parallel with structure.

Result

Handed over on the peak-season milestone; fewer trade clashes on site.