Problem
The owner needed more floor area while the live line kept running.
Factories & logistics · 2025
The owner needed more floor area while the live line kept running.
H2Q phased works by shift, tightened boundary HSE and coordinated MEP in parallel with structure.
Handed over on the peak-season milestone; fewer trade clashes on site.