Clash review costs less than reopening ceilings
Pipe–beam–cable clashes found on drawings cost hours; found after finishes cost weeks. H2Q puts shop drawings and clash review ahead of hang schedules.
MEP — electrical, plumbing, HVAC
Coordinated design and install of electrical–plumbing–HVAC by zone; system acceptance before ceiling close.
Discuss this serviceSystems
Elec · Plumb · HVAC
Priority
Early clash review
Method
By zone
Output
O&M + running systems
Detailed content
MEP is where expensive rework often appears. H2Q prioritises early clash review, hang–wire schedules by floor/zone, and system acceptance before ceiling close. Goal: systems that run at occupation — not only systems that were installed.
Pipe–beam–cable clashes found on drawings cost hours; found after finishes cost weeks. H2Q puts shop drawings and clash review ahead of hang schedules.
Each zone has a clear hang–wire window. Each system (power, water, HVAC) has test checklists before ceiling close or room handover.
Short O&M notes, service points and warranty contacts travel with the systems. Ops teams should not guess after contractors leave.
01 / 03
MEP coordination before ceiling close
Process
Shop drawings, clash review and structure interfaces.
Hang, wire and install equipment by floor/area.
System commissioning with recorded readings.
O&M package and early operating guidance.
Clarify function, life-cycle cost and discipline interfaces before construction starts.
Main contract or civil–industrial trade packages; site safety and weekly progress reporting.
Coordinate design–trades–acceptance; control variations for the owner.
Technical systems timed with structure and fit-out