MEP — electrical, plumbing, HVAC

MEP — electrical, plumbing, HVAC

Technical systems timed with structure and fit-out

Coordinated design and install of electrical–plumbing–HVAC by zone; system acceptance before ceiling close.

Discuss this service

Systems

Elec · Plumb · HVAC

Priority

Early clash review

Method

By zone

Output

O&M + running systems

Detailed content

MEP is where expensive rework often appears. H2Q prioritises early clash review, hang–wire schedules by floor/zone, and system acceptance before ceiling close. Goal: systems that run at occupation — not only systems that were installed.

Clash review costs less than reopening ceilings

Pipe–beam–cable clashes found on drawings cost hours; found after finishes cost weeks. H2Q puts shop drawings and clash review ahead of hang schedules.

Install by zone, accept by system

Each zone has a clear hang–wire window. Each system (power, water, HVAC) has test checklists before ceiling close or room handover.

O&M documents travel with handover

Short O&M notes, service points and warranty contacts travel with the systems. Ops teams should not guess after contractors leave.

Reference images

MEP coordination before ceiling close
Electrical systems and control panels
Testing and commissioning by system

01 / 03

MEP coordination before ceiling close

Process

How we deliver

  1. 01

    1. Shop drawings & clash

    Shop drawings, clash review and structure interfaces.

  2. 02

    2. Zone install

    Hang, wire and install equipment by floor/area.

  3. 03

    3. Testing

    System commissioning with recorded readings.

  4. 04

    4. O&M handover

    O&M package and early operating guidance.

Scope of work

  • 01Clash review and shop drawings
  • 02Electrical / plumbing / HVAC install
  • 03Testing and commissioning
  • 04O&M documentation handover